About ProfitDig

Sign Up

No contract. Cancel any time. Starts at $99/mo.

Features

Learn what ProfitDig can do for you.

About Us

Country boys from Tennessee with a dream.

Education

Articles

We publish a TON of articles about building a successful construction company.

Videos

Over 300 videos on being a successful contractor.

Podcast

Listen to the ProfitDig Radio Show on major streaming platforms or right here!

Construction Calculators

Calculators for concrete volume, percent of fall and more.

Contact

Sign Up

Let’s go!

Contact Us

Got any questions?

Easy job bidding and costing for construction contractors just like you.

Seven Key Considerations for Estimating Underground Utility Construction Projects

May 20, 2023 | Blog, Utilities

With the increasing demand for advanced infrastructure and utility solutions, contractors are regularly entrusted with complex underground utility construction projects. After the foundation, you could arge utilities are the most important thing. You can’t do anything without the utilities! Accurate cost estimation is crucial in such endeavors for securing contracts and ensuring project profitability. This article explores the seven most important factors that contractors should consider when estimating an underground utility construction job.

1. Site Investigation and Soil Conditions

A thorough site investigation is crucial to unearth possible challenges and prepare for unexpected developments. A site’s geological conditions — rock hardness, soil type, groundwater levels, and presence of existing utilities — significantly influence the construction approach, equipment required, and the overall project timeline. Contractors should engage professionals to conduct soil tests and geotechnical surveys. Remember, understanding the lay of the land aids in accurate estimation. And the last thing you want to do is cut into existing utilities like a gas line!

2. Utility Detection

Prior to embarking on any underground utility project, it’s imperative to map out existing utilities accurately. Unanticipated utility lines can result in costly project delays and potential safety risks. Utilize utility detection methods, such as ground-penetrating radar and electromagnetic detectors, to help reduce these risks. Additionally, leverage public utility maps and “call before you dig” services. This could save you time and money.

3. Construction Methods and Equipment

Different utility construction projects may require varying construction methods, like open trench, horizontal directional drilling (HDD), or pipe jacking, depending on the project’s scale and complexity. Each method has its own costs, timelines, and feasibility factors. Accordingly, the type and quantity of equipment necessary, such as excavators, drill rigs, or trenchers, also influence the cost estimate.

4. Labor Costs

Labor cost is another major factor in project estimation. It’s essential to consider not only the number of workers required but also their skills, qualifications, and labor rates. Time-dependent factors like overtime should also be anticipated. Familiarize yourself with local labor laws and standard rates to avoid unexpected labor costs. Make sure you have the crew to do the job!

5. Permits, Regulations, and Safety Compliance

Every utility construction project must adhere to local and national building codes, environmental regulations, and safety standards. The cost of permits, inspections, and ensuring safety compliance should be included in your estimate. In addition, planning for potential fines for non-compliance is prudent. Consulting with legal experts or experienced professionals can assist in understanding these costs better.

6. Contingency Planning

Despite the best planning, underground utility projects often face unexpected issues. Changes in weather conditions, unforeseen site complications, equipment failures, or labor shortages can impact project timelines and costs. A well-estimated contingency fund (typically 10-20% of the total project cost) can be the difference between a project’s success or financial strain.

7. Project Management and Operational Overheads

Estimating an underground utility construction job isn’t just about accounting for the direct costs. Indirect costs, such as project management, administration, and other operational overheads, are also significant contributors to the total project cost. It’s essential to incorporate these costs to avoid underestimating the project’s financial demands. It costs you money just to run your business, so make sure you account for those costs.

Remember, successful cost estimation for underground utility construction jobs demands meticulous planning, understanding project intricacies, and leveraging professional expertise. By thoroughly considering the seven factors above, you’ll create more accurate, competitive, and profitable project estimates.

Bonus: make your life easier by using ProfitDig to create your job bids and track your costs!